Water Board Releases Beaumont’s $3.2 Million Sewer Design

The Financial ‘Plan’ is Increased Sewer Fees and Bond Debt. The Brine Line Plan is an Insanity.

The California Water Quality Control Board has Released Beaumont’s $3.2 Million Sewer Design.

It’s a 1.7 GB zip file that can be downloaded at the following link to the web page:

https://ftp.waterboards.ca.gov/

Username : rb8adminrecord

Password : TiX3Hn

Parts of the Plan say: “Draft, not for the Public”.

If it’s submitted to the Water Board, it’s a public document.