Mello Roos 2007 Series A, B, C, and E

By: Libi Uremovic | Original Article at patch.com

The City of Beaumont Received $4,456,239 to pay for items such as TUMF, Fire Station, Regional Park, and a Community Recreation Center.

Beaumont Mello Roos 2007 Series A, B, C, and E

In 2007 the City of Beaumont acquired four (4) bonds totaling $61,800,000. The City combined the Bond Requisitions, but they must be accounted for separately. Most of the Bond Requisitions are for Area 2007A and 2007E.

In total; the City received $4,456,239 to pay for items such as TUMF, Fire Station, Regional Park, and a Community Recreation Center.

Urban Logic Consultants received $4,622,932 for Formation & Financing Costs, Oak Valley Parkway, Palm & Penn Ave, and Facilities Engineering

2007A $21,175,000 Areas 3, 11, 14AB
Requisition Numbers 1 thru 30
Dated From 2007 to 2011
Total: $4,539,162.68
City of Beaumont: $298,222.16 Community Recreation Center
CFD 2000A: $93,750.00 Mkt 2000A Absorption Study/Empire Economics
Mike Moreno: $5,500 Transportation Projects
Union Bank: $237,060.00 2004 ABC Palm ave Rehab
Urban Logic Consultants: $3,904,630.52 OVP, Palm & Penn Ave, Facilities Engineering

2007B $11,615,000 Area 8
Requisition Number 1 Cost of Issuance only
Dated 04/20/2007
Total: $29,200.00
CFD 2000A $29,200.00 Market Absorption Study/Empire Economics

2007C $22,490,000 Area 9, 10A
Requisition Number 2 Cost of issuance only
Dated From 2007
Total $47,500.00
Urban Logic Consultants: $47,500.00 Formation & Financing Costs

2007E $6,520,000 Area 8C
Requisition Numbers 1 thru 9
Dated From 2008 to 2011
Total: $5,291,348.60
Automated Gate Services: $954.50
Beaumont Utility Authority: $345,516.00 Sewer Treatment Capacity Fees

CITY OF BEAUMONT: $4,158,017.28
01/07/2008 $3,601,938.04 STWMA, TUMF, Fire Station, Regional Park, Citywide Fees
02/13/2008 $181,541.80 Prepaid Citywide Fees 110 D.U. @ $1,650.38 each
06/02/2009 $374,527.24 Community Rec Center

Empire Economics: $19,225 Mkt Absorb & Housing Sales/Price Study
FPR: $17,327.77 O.S. Printing Charges ( Remainder paid from Admin Fund)
Goodwin Procter LLP: $35,000 Legal Services
Riverside Flood Control: $10,000 Conceptual Plan
Rod Gunn: $12,500 Financial Consulting Study
Union Bank: $14,677.95 Admin Billing
Urban Logic Consultants: $670,802.33 Joint & Critical Facility Engineering